[1] 沈荣澍, 代厚兵, 杨韦.脱硫废水常规处理及零排放技术综述[J]. 锅炉制造, 2013(2):44-47.SHEN Rongshu, DAI Houbing, YANG Wei. Desulphurization wastewater treatment and zero discharge technology[J]. Boiler Manufacturing, 2013(2):44-47.
[2] 叶春松, 罗珊, 张弦, 等. 燃煤电厂脱硫废水零排放处理工艺[J]. 热力发电, 2016, 45(9):105-108.YE Chunsong, LUO Shan, ZHANG Xian, et al. Key problems and developing trend of zero of discharge technology of desulfurization waste water[J]. Thermal Power Generation, 2016, 45(9):105-108.
[3] 晋银佳, 王帅, 姬海宏, 等. 深度过滤–烟道蒸发处理脱硫废水的数值模拟[J]. 中国电力, 2016, 49(12):174-179.JIN Yinjia, WANG Shuai, JI Haihong, et al. Numerical simulation of desulfurization wastewater treatment with in-depth filtration-flue evaporation process[J]. Electric Power, 2016, 49(12):174-179.
[4] HUANG Y H, PEDDI P K, TANG C, et al. Hybrid zero-valent iron process for removing heavy metals and nitrate from flue-gas-desulfurization wastewater[J]. Separation and Purification Technology, 2013, 118(30):690-698.
[5] 庞胜林, 陈戎, 毛进, 等. 火电厂石灰石–石膏湿法脱硫废水分离处理[J]. 热力发电, 2016, 45(9):128-133.PANG Shenglin, CHEN Rong, MAO Jin, et al. Separation treatment process for limestone-gypsum wet FGD wastewater from coal-fired power plants[J]. Thermal Power Generation, 2016, 45(9):128-133.
[6] 吴怡卫. 石灰石–石膏湿法烟气脱硫废水处理的研究[J]. 中国电力, 2006, 39(4):75-78.WU Yiwei. Study on the wastewater treatment in limestone-gypsum wet FGD process[J]. Electric Power, 2006, 39(4):75-78.
[7] 禾志强, 祁利明. 火力发电厂烟气脱硫废水处理工艺[J]. 水处理技术, 2010, 36(3):133-135.HE Zhiqiang, QI Liming. Wastewater treatment process of flue gas desulfurization in the power plant[J]. Technology of Water Treatment, 2010, 36(3):133-135.
[8] 李泊娇, 王旭东, 张占梅, 等. 石灰石–石膏湿法脱硫废水的处理及利用研究[J]. 电力科技与环保, 2014, 30(2):29-31.LI Bojiao, WANG Xudong, ZHANG Zhanmei, et al. Treatment and utilization of waste water from limestone-gyspum wet flue gas desulfurization[J]. Electric Power Technology and Environmental Protection, 2014, 30(2):29-31.
[9] 聂鹏飞. 600 MW机组湿法脱硫废水处理系统的优化改造[J]. 热力发电, 2011, 40(10):62-65, 9.NIE Pengfei. Optimized retrofit of wastewater treatment system in wet desulphurization of 600MW unit[J]. Thermal Power Generation, 2011, 40(10):62-65, 9.
[10] 马双忱, 于伟静, 贾绍广, 等. 燃煤电厂脱硫废水处理技术研究与应用进展[J]. 化工进展, 2016, 35(1):255-262.MA Shuangchen, YU Weijing, JIA Shaoguang, et al. Research and application progresses of flue gas desulfurization (FGD) wastewater treatment technologies in coal-fired plants[J]. Chemical Industry and Engineering Progress, 2016, 35(1):255-262.
[11] 王治安, 林卫, 李冰. 脱硫废水零排放处理工艺[J]. 电力科技与环保, 2012, 28(6):37-38.WANG Zhian, LIN Wei, LI Bing. Discussion on process of desulfurization waste water's zero-draining disposal[J]. Electric Power Technology and Environmental Protection, 2012, 28(6):37-38.
[12] 吴优福, 刘捷, 海玉琰, 等. 超超临界1000 MW机组脱硫废水零排放技术[J]. 热力发电, 2017, 46(5):108-114.WU Youfu, LIU Jie, HAI Yuyan, et al. Discussions on zero-discharge technology of desulfurization wastewater for ultra supercritical units[J]. Thermal Power Generation, 2017, 46(5):108-144.
[13] 刘秋生. 烟气脱硫废水"零排放"技术应用[J]. 热力发电, 2014, 43(12):114-117.LIU Qiusheng. Application and comparison of zero discharge' technology for desulfurization waste water[J]. Thermal Power Generation, 2014, 43(12):114-117.
[14] 龙国庆. 燃煤电厂湿法脱硫废水蒸发结晶处理工艺的选择[J]. 中国给水排水, 2013, 29(24):5-8.LONG Guoqing. Selection of evaporation crystallization treatment process of wastewater from wet FGD in coal-fired power plant[J]. China Water & Wastewater, 2013, 29(24):5-8.
[15] 张江涛, 曹红梅, 董娟, 等. 火电厂废水零排放技术路线比较及影响因素分析[J]. 中国电力, 2017, 50(6):120-124.ZHANG Jiangtao, CAO Hongmei, DONG Juan, et al. Comparison on the technical routes of zero liquid discharge of fossil-fired power plants and analysis on the influencing factors[J]. Electric Power, 2017, 50(6):120-124.
[16] 王璟, 王正江, 杨宝红, 等. 燃煤电厂末端废水固化预处理工艺试验研究[J]. 热力发电, 2010, 39(10):55-59.WANG Jing, WANG Zhengjiang, YANG Baohong, et al. Test study on solidification pretreatment technology of terminal waste-water form coal-fired power plants[J]. Thermal Power Generation, 2010, 39(10):55-59.
[17] 刘亚鹏, 王金磊, 陈景硕, 等. 火电厂脱硫废水预处理工艺优化及管式微滤膜实验研究[J]. 中国电力, 2016, 49(2):153-158.LIU Yapeng, WANG Jinlei, CHEN Jingshuo, et al. Optimization of FGD wastewater pretreatment technique for thermal power plant and test studies on tubular crossflow microfiltration process[J]. Electric Power, 2016, 49(2):153-158.
[18] 王可辉, 蒋芬, 徐志清, 等. TMF+DTRO工艺深度处理脱硫废水中试试验研究[J]. 电力科技与环保, 2017, 33(3):15-17.WANG Kehui, JIANG Fen, XU Zhiqing, et al. Experimental study on TMF + DTRO advanced treatment of desulphurization wastewater from coal-fired power plant[J]. Technology of Water Treatment, 2017, 33(3):119-124.
[19] 钱感, 关洪银. 燃煤电厂脱硫废水综合处理工艺[J]. 水处理技术, 2017, 43(2):136-138.QIAN Gan, GUAN Hongyin. Treatment technology of desulfurization wastewater in coal-fired power plant[J]. Technology of Water Treatment, 2017, 43(2):136-138. |