[1] 赵竣屹,孟江丽. 大机组深度调峰运行的可靠性与经济性研究方式的探讨[J]. 山西电力,2005,25(4):27-30. ZHAO Junyi, MENG Jiangli. Discussion for reliability and economy of deeply peak shaving adjusting of large generator [J]. Shanxi Electric Power, 2005, 25(4): 27-30. [2] BILLINTON R, GE J A. Comparison of four-state generating unit reliability models for peaking units[J]. IEEE Trans on Power Systems, 2004, 19(2): 763-768. [3] 焦庆丰,雷霖,李明,等. 国产600 MW超临界机组宽度调峰试验研究[J]. 中国电力,2013,46(10):1-4, 34. JIAO Qingfeng, LEI Lin, LI Ming, et al . Testing on domestically- made 600 MW supercritical units in broad peak-regulation of power grids [J]. Electric Power, 2013, 46(10): 1-4, 34. [4] 李玲,胥建群,石永锋. 600 MW汽轮机组运行方式优化研究[J]. 发电设备,2010,24(6):396-400. LI Ling, XU Jianqun, SHI Yongfeng. Operation mode optimization for a 600 MW steam turbine unit[J]. Power Equipment, 2010, 24(6): 396-400. [5] 张宁,周天睿,段长刚,等. 大规模风电场接入对电力系统调峰的影响[J]. 电网技术,2010,34(1):152-158. ZHANG Ning, ZHOU Tianrui, DUAN Changgang, et al . Impact of large scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(1): 152-158. [6] 赵洁,刘涤尘,杨楠,等. 核电机组参与电网调峰的运行方式及效益分析[J]. 电网技术,2012,36(12):250-255. ZHAO Jie, LIU Dichen, YANG Nan, et al . Operation mode and benefits of nuclear power plant participating in peak load regulation of power system[J]. Power System Technology, 2012, 36(12): 250-255. [7] 韩小琪,孙寿广,戚庆茹. 从系统调峰角度评估电网接纳风电能力[J]. 中国电力,2010,43(6):16-19. HAN Xiaoqi, SUN Shouguang, QI Qingru. Evaluation of wind power penetration limit from peak regulation[J]. Electric Power, 2010, 43(6): 16-19. [8] 张志明,胡三高,黄述真,等. 大型汽轮发电机组调峰的综合评价与优化分析[J]. 中国电力,2004,37(3):26-30. ZHANG Zhiming, HU Sangao, HUANG Shuzhen, et al . Overall evaluation and optimization analysis on the cyclic operation of large size turbo-generator unit [J]. Electric Power, 2004, 37(3):26-30. [9] 阎维平,路长,周义刚,等. 提升大型火电机组出力应对电网峰值负荷的分析[J]. 电力科学与工程,2015,31(1):1-4. YAN Weiping, LU Chang, ZHOU Yigang, et al . Discussion on increasing thermal power unit output to meet the power grid peak load [J]. Electric Power Science and Engineering, 2015, 31(1): 1-4. [10] HANAK D P, BILIYOK C, MANOVIC V. Evaluation and modeling of Part-Load Performance of coalfired power plant with postcombustion CO 2 capture[J]. Energy & Fuels, 2015, 29(6): 3833-3844. [11] 张保衡. 大容量火电机组寿命管理与调峰运行[M]. 北京:水利电力出版社,1988:256-264. [12] 王凯,黄葆华,司派友. 火电机组调峰裕度的影响因素研究[J]. 节能技术,2012,30(1):52-54. WANG Kai, HUANG Baohua, SI Paiyou. Research on influencing factors of peak-regulation margin in power plant units [J]. Energy Conservation Technology, 2012, 30(1): 52-54. [13] 任曙,沈友望. 国产200 MW机组启停方式燃料损耗计算方法的研究[J]. 中国电机工程学报,1987,7(5):14-25. REN Shu, SHEN Youwang. The research of calculating method of fuel loss for domestic 200 MW units in various starting conditions [J]. Proceedings of the CSEE, 1987, 7(5): 14-25. [14] 张桂燕. 300 WM火电调峰机组运行问题的研究[D]. 保定:华北电力大学,2008. [15] 李今朝. 国产300 MW火电机组调峰方式的研究[D]. 保定:华北电力大学,2005. [16] 赵春风,李宏进. 300 MW机组调峰运行的研究与分析[J]. 东北电力技术,2002,23(6):5-7. ZHAO Chunfeng, LI Hongjin. Research and analysis on peak clipping operation of 300 MW generating sets [J]. Northeast Electric Power Technology, 2002, 23(6): 5-7. [17] 杨高强. 抽水蓄能机组与火电机组启停调峰过程的比较分析[D]. 长沙:长沙理工大学,2013. [18] 杨丽君. 元宝山发电厂600 MW汽轮机转子热应力及启停损失计算分析[J]. 黑龙江电力,1996,18(4):207-210. YANG Lijun. Calculating analysisof rotor’s thermal stressand loss on start-stop of 600 MW turbine inyuanbaoshan power plant [J]. Heilongjiang Electric Power, 1996, 18(4): 207-210. [19] 杨丽君. 论大机组调峰问题[J]. 东北电力技术,1997,18(6):10-13. YANG Lijun. Discuss on the peak-regulation problem of large- capacity power unit [J]. Northeast Electric Power Technology, 1997, 18(6): 10-13. |