[1] 舒印彪. 我国特高压输电的发展与实施[J]. 中国电力,2005,38(11):1-8. SHU Yinbiao. Development and execution of UHV power transmission in China [J]. Electric Power, 2005, 38(11): 1-8. [2] 吴昌栋,陈云波. 钢管结构在建筑工程的应用[J]. 工业建筑,1997,27(2):10-15. WU Changdong, CHEN Yunbo. Steel structure building engineering applications[J]. Industrial Buildings, 1997, 27(2): 10-15. [3] SHENG N, YAM M C H, IU V P. Analytical investigation and the design of the compressive strength of steel gusset plate connections [J]. Journal of Constructional Steel Research, 2002, 58(6): 1473-1493 [4] LUTZ D G, LABOUBE R A. Behavior of thin gusset plates in compression [J]. Thin-Walled structures, 2005, 43(6): 861-875. [5] HUNS B B S, GRONDIN G Y, DRIVER R G. Tension and shear block failure of bolted gusset plates [J]. Canadian Journal of Civil Engineering, 2006, 33(9): 395-408. [6] DRIVER R G, GRONDIN G Y, KULAK G L. Unified block shear equation for achieving consistent reliability[J]. Journal of Constructional Steel Research, 2006, 62(3): 210-222. [7] 鞠彦忠,雷俊方,王德弘. 钢管角钢组合塔节点极限承载力影响因素分析[J]. 中南大学学报(自然科学版),2014,45(8):2781-2786. JU Yanzhong, LEI Junfang, WANG Dehong. Angle steel tower combination factors ultimate strength analysis[J]. Journal of Central South University(Science and Technology), 2014, 45(8):2781-2786. [8] 鞠彦忠,曹强,雷俊方. 钢管角钢组合塔节点的极限承载力研究[J]. 华东电力,2011,39(2):213-216. JU Yanzhong, CAO Qiang, LEI Junfang. Ultimate bearing capacity of steel angle steel tower combination node[J]. East China Electric Power, 2011, 39(2): 213-216. [9] 鞠彦忠,雷俊方,曾建华,等. 钢管角钢组合塔节点板的破坏模式分析[J]. 华东电力,2011,39(8):1238-1243. JU Yanzhong, LEI Junfang, ZENG Jianhua, et al. Angle steel tower combination gusset plate failure mode analysis[J]. East China Electric Power, 2011, 39(8): 1238-1243. [10] 黄璜,任宗栋,默增禄. 1 000 kV特高压钢管塔塔身变坡节点的优化设计[J]. 电力建设,2012,33(4):28-31. HUANG Huang, REN Zongdong, MO Zenglu. Optimal design 1 000 kV UHV steel tower body node variable slope[J]. Electric Power Construction, 2012, 33(4): 28-31. [11] 陈加宝,雷俊方. 输电塔K节点极限承载力影响因素分析[J]. 广东电力,2015,28(2):107-109,119. CHEN Jiabao, LEI Junfang. Analysis on influence factor on ultimate bearing capacity of K node of power transmission tower[J]. Guangdong Electric Power, 2015, 28(2): 107-109, 119. [12] 廖邢军,邓洪洲. 钢管塔法兰螺栓连接式变坡节点有限元分析[J]. 电力建设,2013,34(10):34-39. LIAO Xingjun, DENG Hongzhou. Steel tower flanges bolted variable slope finite element analysis[J]. Electric Power Construction, 2013, 34(10): 34-39. [13] 舒兴平,肖又箐,袁智深. K形管板节点极限承载力研究[J]. 建筑结构,2010,40(5):92-96. SHU Xingping, XIAO Youjing, YUAN Zhishen, et al. Nonlinear finite element analysis on ultimate strength oftube-gusset K-joints[J]. Building Structure, 2010, 40(5): 92-96. [14] 黄彭,莫娟,万建成,等. 架空输电线路节能导线应用技术经济分析[J]. 中国电力,2013,46(7):153-157. HUANG Peng, MO Juan, WAN Jiancheng, et al. Overhead transmission line conductors of energy-saving technologies applied economic analysis [J]. Electric Power, 2013, 46(7): 153-157. [15] 张晓,周浩,赵斌财,等. 500 kV同塔四回输电线路最优相序布置[J]. 中国电力,2010,43(2):44-47. ZHANG Xiao, ZHOU Hao, ZHAO Bincai, et al. 500 kV Four- circuit transmission line tower with optimal phase sequence arrangement [J]. Electric Power, 2010, 43(2): 44-47. |