[1] 夏正春,李黎,梁政平,等. 输电塔在线路断线作用下的动力响应[J]. 振动与冲击,2007,26(11):45-49. XIA Zheng-chun, LI Li, LIANG Zheng-ping, et al . Dynamic response of transmission tower with ruptured wires[J]. Journal of Vibration and Shock, 2007, 26(11): 45-49 [2] 杨风利,杨靖波,张子富,等. 输电线路导线断线试验及数值模拟分析[J]. 振动工程学报,2012,25(2):154-160. YANG Feng-li, YANG Jing-bo, ZHANG Zi-fu, et al . Experiments and numerical simulation on the broken conductors in transmission lines [J]. Journal of Vibration Engineering, 2012, 25(2): 154-160. [3] 李黎,夏正春,江宜城,等. 输电线断线振荡研究[J]. 工程力学,2008,25(6):l65-169. LI Li, XIA Zheng-chun, JIANG Yi-cheng, et al . Study on wire breaking induced vibration of electric transmission line[J].Engineering Mechanics, 2008, 25(6): 165-l69. [4] THOMAS M B, PEYROT A H. Dynamic response of ruptured conductors in transmission lines [J]. IEEE Trans Power Apparatus Syst PAS,1982,101(9): 3022-3027. [5] LUMMIS J, POHLMAN J C. Flexible transmission structures operate to suppress cascading falures[C]//IEEE PES Winter Meeting, New York: 1974. [6] 沈国辉,默增禄,孙炳楠,等. 突然断线对输电塔线体系的冲击作用研究[J]. 振动与冲击,2009,28(12):4-8. SHEN Guo-hui, MO Zeng-lu, SUN Bing-nan, et al . Research of impact effect on transmission line system due to sudden breakage of conductor[J]. Journal of Vibration and Shock, 2009, 28(12): 4-8. [7] 欧阳克俭,刘纯,陈红冬,等. 500 kV输电线路子导线断裂原因分析[J]. 电力建设,2012,33(11):74-78. OUYANG Ke-jian, LIU Chun, CHEN Hong-dong, et al . Analysis of sub-conductor fracture in 500 kV transmission line [J]. Electric Power Construction, 2012, 33(11): 74-78. [8] 胡位勇,严波,程皓月,等. 输电塔线体系断线动力响应及杆塔破坏模拟研究[J]. 应用力学学报,2012,29(4):431-436. HU Wei-yong, YAN Bo, CHENG Hao-yue, et al . Transmission line system disconnected simulation study of dynamic response and tower destruction[J]. Chinese Journal of Applied Mechanics 2012, 29(4): 431-436. [9] 李清华,杨靖波,韩军科,等. 超/特高压交流同塔四回钢管塔设计及试验[J]. 中国电力,2012,45(3):14-17. LI Qing-hua, YANG Jing-bo, HAN Jun-ke, et al . Design and full-scale test for steel tubular tower of UHV and EHV quadruple-circuit transmission line on the same tower [J]. Electric Power, 2012, 45(3): 14-17. [10] 谭青海,董铁柱,吴海洋,等. 高强度螺栓在输电铁塔上的应用[J]. 中国电力,2012,45(5):39-42. TAN Qing-hai, DONG Tie-zhu, Wu Hai-yang, et al . Research on utilization of high-strength bolt in the transmission towers[J]. Electric Power, 2012, 45(5): 39-42. [11] 周魁,陈媛,刘利林,等. 大截面导线在特高压直流输电线路中的应用前景[J]. 中国电力,2012,45(4):35-37. ZHOU Kui, CHEN Yuan, LIU Li-lin, et al . Application prospect of large cross-section conductor on UHVDC transmission line [J]. Electric Power, 2012, 45(4): 35-37. [12] 张晓,周浩,赵斌财,等. 500 kV同塔四回输电线路最优相序布置[J]. 中国电力,2010,43(2):44-47. ZHANG Xiao, ZHOU Hao, ZHAO Bin-cai, et al . Research on optimized phase sequence arrangements for 500 kV quadruple- circuit transmission line on the same tower[J]. Electric Power,2010, 43(2): 44-47. [13] PEYROT A H, LEE J W. Longitudinal loads from broken conductors and broken insulators and their effect on transmission lines[J]. IEEE Transcations on Power Apparatus and Systems,1980, 99(1): 222-234. [14] MOZER J D, WOOD W A, HRIBAR J A, et al . Broken wire tests on a model transmission line system[J]. IEEE Transcations on Power Apparatus and Systems, 1981, 100(3): 938-947. [15] 张殿生. 电力工程高压送电线路设计手册[M]. 北京:中国电力出版社,2002. [16] GB 50545—2010 110~750 kV架空输电线路设计规范[S]. 北京:中国计划出版社,2010. |