[1] 罗凯明,孙勇,王毅. 电网备用容量可靠性研究[J]. 华东电力,2008,36(6):53-56. LUO Kaiming, SUN Yong, WANG Yi. Reliability of power system reserve capability[J]. East China Electric Power, 2008, 36(6): 53-56. [2] 程林,郭永基. 发输电系统充裕度和安全性算法研究[J]. 电力系统自动化,2001,25(19):23-26. CHENG Lin, GUO Yongji. New algorithm of adequacy and security evaluation for bulk power system[J]. Automation of Electric Power Systems, 2001, 25(19): 23-26. [3] 于洋,陈琳,甘德强,等. 国内外备用容量评估方法比较[J]. 电力系统自动化,2005,29(18):19-23. YU Yang, CHEN Lin, GAN Deqiang, et al. Comparison between foreign and domestic experiences in reserve assessment[J]. Automation of Electric Power Systems, 2005, 29(18): 19-23. [4] CHEN J, TAORP J S, DOBSOH I. Cascading dynamics and mitigation assessment in power system disturbances via a hidden failure model[J]. International Journal of Electrical Power and Energy Systems, 2005, 27(4): 318-326. [5] 贾燕冰,严正,孙勇,等. 互联电网共享运行备 用可靠性评估[J]. 电力系统自动化,2009,33(16):13-18. JIA Yanbing, YAN Zheng, SUN Yong, et al. Shareable operational reserve reliability evaluation for multi-area power networks[J]. Automation of Electric Power Systems, 2009, 33(16):13-18. [6] 王磊,赵书强,张明文. 基于最小负荷消减费用的输电系统可靠性评估[J]. 中国电力,2011,44(5):26-29. WANG Lei, ZHAO Shuqiang, ZHANG Mingwen. Reliability evaluation of transmission system based on minimum load shedding cost [J]. Electric Power, 2011, 44(5): 26-29. [7] 丁明,齐先军,安玲. 旋转备用市场中考虑可靠性的多目标分层决策[J]. 电力系统自动化,2007,31(13):17-22. DING Ming, QI Xianjun, AN Ling. Multi-objective and layered decision making in the spinning reserve market considering reliability[J]. Automation of Electric Power Systems, 2007, 31(13): 17-21. [8] 陈兆庆,张建平. 华东电网合理备用容量研究[J]. 华东电力,2008,36(11):121-125. CHEN Zhaoqing, ZHANG Jianping. Study of reasonable reserve capacity of East China Power Grid [J]. East China Electric Power, 2008, 36(11): 121-125. [9] GUO Yongji, XI Yongjian, XIAO Kai, et al. Composite system reliability evaluation based on monte-carle simulation combined with outages screening[J]. IEEE Transactions on Power Systems, 1999, 32(9): 1123-1131. [10] 葛夕武,严正,贾燕冰,等. 计及输电线路约束的华东电网备用容量可靠性评估[J]. 华东电力,2008,36(3):39-42. GE Xiwu, YAN Zheng, JIA Yanbing, et al. Reserve capacity reliability assessment for East China Power Grid with consideration of transmission restrictions [J]. East China Electric Power, 2008,36(3): 39-42. [11] 王彬,何光宇,梅生伟,等. 智能电网评估指标体系的构建方法[J]. 电力系统自动化,2011,35(23):1-5. WANG Bin, HE Guangyu, MEI Shengwei, et al. Construction method of smart grid’s assessment index system [J]. Automation of Electric Power Systems, 2011, 35(23): 1-5. [12] 王智冬,李晖,李隽,等. 智能电网的评估指标体系[J]. 电网技术,2009,33(17):14-18. WANG Zhidong, LI Hui, LI Jun, et al. Assessment index system for smart grids [J]. Power System Technology, 2009, 33(17): 14-18. [13] 武宏波,胡静. 改进模糊运算方法及在电力系统风险评估的应用[J]. 中国电力,2012,45(5):52-56. WU Hongbo, HU Jing. An improved fuzzy algorithm and its application in power system risk assessment[J]. Electric Power, 2012, 45(5): 52-56. [14] 葛少云,董静媛,王晓东,等. 基于模糊推理的城市中压配电网供电能力评估[J]. 电力系统及其自动化学报,2004,16(6):14-17. GE Shaoyun, DONG Jingyuan, WANG Xiaodong, et al. Evaluation of power supply capability in MV distribution networks based on fuzzy reasoning [J]. Proceedings of Electric Power System and Automation, 2004, 16(6): 14-18. [15] 宿晓岚,赵渊,钟家华,等. 大电网可靠性评估的随机响应面法[J]. 中国电力,2014,47(8):1-7. SU Xiaolan, ZHAO Yuan, ZHONG Jiahua, et al. Reliability evaluation for bulk power systems by using stochastic response surface method [J]. Electric Power, 2014, 47(8): 1-7. [16] Q/GDW 565—2010 城市配电网运行水平和供电能力评估导则[S]. [17] 金菊良,魏一鸣. 复杂系统广义智能评价方法和应用[M]. 北京:科学出版社,2008. [18] 张蔓,林涛,曹健,等. 2种电能质量综合评估方法的分析比较[J]. 电力系统自动化,2008,32(21):38-40. ZHANG Man, LIN Tao, CAO Jian, et al. A comparative study on two methods for synthetic evaluation of power quality[J]. Automation of Electric Power Systems, 2008, 32(21): 37-40. [19] 廖胜利,程春田,蔡华祥,等. 改进的火电调峰方式[J]. 电力系统自动化,2006,30(1):89-93. LIAO Shengli, CHENG Chuntian, CAI Huaxiang, et al. Improved algorithm of adjusting discharge peak by thermal power plants[J].Automation of Electric Power Systems, 2006, 30(1): 89-93. |