基于引水渠及前池改造的小水电调节光伏能力及综合效益分析

Analysis on photovoltaic regulation capacity and comprehensive benefits of small hydropower through renovation of diversion canals and forebays

  • 摘要: 随着分布式光伏在农村电网的广泛接入,电网面临过电压、弃光和反向潮流等挑战。针对西南地区部分引水式小水电库容有限、调节能力不足的问题,提出一种基于引水渠与前池改造的库容扩容方法,构建兼顾调节性能、经济效益与投资回收期的综合优化模型。通过“渠底下挖与前池加高”结合的技术路径,在不改变电站原有主体结构的前提下,显著提升有效调节库容。通过多组扩容方案的比较,最终筛选出蓄水池加高2 m(有效库容1146.41 m3)和加高3.69 m(有效库容2340.28 m3)2个方案,均表现出良好的调节能力和经济性。蓄水池加高2 m时,电站停发调节时间在枯水期为100 min,平水期为33.53 min,丰水期为15.89 min;加高3.69 m时,停发调节时间分别为209.73 min、70.04 min和33.19 min。依托“光伏优先,水电调节”的水光互补模式,电站实现了光伏电量的有效消纳,为西南地区构建高比例新能源接入的水光互补系统提供了可推广的技术路径和工程示范价值。

     

    Abstract: With the widespread integration of distributed photovoltaics (PV) into rural power grids, the grids are confronted with challenges such as overvoltage, PV curtailment, and reverse power flow. Aiming at the problems of limited storage capacity and insufficient regulation capacity of some diversion-type small hydropower stations in Southwest China, this study proposes a storage capacity expansion method based on reconstruction of the diversion canals and forebays, and constructs a comprehensive optimization model that balances regulating performance, economic benefits, and investment payback period. Through the technical approach combining "canal bottom excavation and forebay heightening", the effective regulating storage capacity is significantly increased on the premise of not changing the original main structure of the hydropower station. By comparing multiple capacity expansion schemes, two schemes are finally selected: 2 m heightening of the forebay (with an effective storage capacity of 1146.41 m3) and 3.69 m heightening (with an effective storage capacity of 2340.28 m3), both of which exhibit excellent regulating capacity and economic performance. For the scheme of 2 m heightening, the shutdown regulation time of the hydropower station is 100 minutes in the dry season, 33.53 minutes in the normal flow season, and 15.89 minutes in the flood season; for the scheme of 3.69 m heightening, the shutdown regulation time is 209.73 minutes, 70.04 minutes, and 33.19 minutes respectively in the three seasons. Relying on the hydro-PV complementarity mode featuring "PV priority and hydropower regulation", the hydropower station has achieved effective absorption of PV power. This study provides a promotable technical path and engineering demonstration value for constructing hydro-PV complementarity systems with high-proportion new energy integration in Southwest China.

     

/

返回文章
返回