高级检索

基于新能源功率品质的储能多时间尺度优化配置

Multi-timescale optimal configuration of energy storage for renewable energy power quality enhancement

  • 摘要: 针对中国电网新能源消纳问题与实现可持续发展的目标,提出计及风电、光伏电力品质划分的双层储能配置优化模型。首先,根据新能源电场历史实际发电功率与预测数据分析预测误差,并考虑典型日负荷与新能源出力特性的相对波动情况,建立功率品质因子模型。然后,构建以系统配置储能获取净收益为目标函数的双层优化模型:上层以储能投资运行成本与消纳收益为基础,优化储能容量与功率配置;下层以系统运行成本、平衡成本及实时调度经济性为目标,生成日前与分区域实时调度计划。双层模型通过协调规划与运行阶段的经济性,实现储能资源的优化分配与调度策略的协同设计。最后,基于品质因子进行多场景概率加权,改进多时间尺度储能配置模型的评估框架,并通过算例分析验证所提模型在提升系统经济性与新能源消纳能力方面的有效性。

     

    Abstract: To address the renewable energy accommodation issue in China's power grid and achieve the goal of sustainable development, this paper proposes a bi-level energy storage configuration optimization model considering power quality classification of wind power and photovoltaic (PV) power. Firstly, a power quality factor model is developed by analyzing the prediction errors based on historical actual generation power and forecast data of new energy power stations, and taking into account the relative fluctuations between typical daily loads and renewable output characteristics. On this basis, a bi-level optimization model is formulated with the net revenue obtained from system-configured energy storage as objective function: The upper level optimizes the energy capacity and power configuration based on the investment and operation cost of energy storage and accommodation returns; the lower level generates day-ahead and zonal real-time dispatch plans with the objective of minimizing the system operation cost and balancing cost alongside real-time dispatch efficiency. This bi-level model realizes the optimal allocation of energy storage resources and the collaborative design of dispatch strategies by coordinating the economy of the planning and operation stages. Finally, a multi-scenario probability weighting based on the quality factor is adopted to improve the evaluation framework of the multi-timescale energy storage configuration model, and case studies verify the effectiveness of the proposed model in improving system economy and new energy accommodation capability.

     

/

返回文章
返回