EPR与CPR1000核电厂1级部件制造与安装水压试验差异研究
赵伟华, 丰慧星
Research on the Differences of Hydrostatic Test for Class 1 Components of EPR and CPR1000 Nuclear Power Plants in the Phases of Manufacturing and Installations
ZHAO Weihua, FENG Huixing
中国电力 . 2017, (3): 92 -95 .  DOI: 10.11930/j.issn.1004-9649.2017.03.092.04