[1] 李海明, 吴平, 付彬, 等. IGCC电站单一煤种运行试验的研究[J]. 中国电力, 2018, 51(1):110-116 LI Haiming, WU Ping, FU Bin, et al. Experimental research on unblended coal combustion in IGCC power station[J]. Electric Power, 2018, 51(1):110-116 [2] 蒋敏华, 黄斌. 燃煤发电技术发展展望[J]. 中国电机工程学报, 2012, 32(29):1-8 JIANG Minhua, HUANG Bin. Prospects on coal-fired power generation technology development[J]. Proceedings of the CSEE, 2012, 32(29):1-8 [3] 何伯述. 热能与动力机械基础[M]. 北京:清华大学出版社, 2010. [4] 高丽. 德士古水煤浆加压气化技术的应用[J]. 煤炭技术, 2010, 29(7):161-162 GAO Li. Application of Texaco coal-water slurry pressurized gasification[J]. Coal Technology, 2010, 29(7):161-162 [5] WOLFERADORF C, MEYER B. The current status and future prospects for IGCC systems[M/OL]//Integrated Gasification Combined Cycle Technologies.[2018-05-06]. https://www.sciencedirect.com/book/9780081001677/integrated-gasification-combined-cycle-igcc-technologies#browse-content. [6] 施强, 乌晓江, 徐雪元, 等. 整体煤气化联合循环(IGCC)发电技术与节能减排[J]. 节能技术, 2009, 27(1):18-20, 96 SHI Qiang, WU Xiaojiang, XU Xueyuan, et al. IGCC power plant with energy conservation and emissions reduction[J]. Energy Conservation Technology, 2009, 27(1):18-20, 96 [7] 王迪. IGCC发电显热回收技术的简介[J]. 中国特种设备安全, 2012(2):68-70 WANG Di. Introduction of IGCC power generation sensible heat recovery technology[J]. China Special Equipment Safety, 2012(2):68-70 [8] DAMEN K, FABER R, GNUTEK R, et al. Performance and modelling of the pre-combustion capture pilot plant at the Buggenum IGCC[J]. Energy Procedia, 2014, 63:6207-6214. [9] 张建府. 整体煤气化联合循环电站空分系统配置及常见故障分析[J]. 发电设备, 2012, 26(1):43-46 ZHANG Jianfu. Configuration and frequent fault analysis of ASU in IGCC power plants[J]. Power Equipment, 2012, 26(1):43-46 [10] 吴学智, 颜海宏, 牛苗任, 等. 与炼化项目集成的IGCC多联供产品可靠性研究[J]. 洁净煤技术, 2015, 21(1):90-94, 116 WU Xuezhi, YAN Haihong, NIU Miaoren, et al. Reliability of IGCC poly-generation system integrated with oil refining project[J]. Clean Coal Technology, 2015, 21(1):90-94, 116 [11] 詹扬, 尤政, 吕俊复. IGCC系统不同气化技术的仿真模拟及性能研究[J]. 中国电力, 2016, 49(10):49-54 ZHAN Yang, YOU Zheng, LV Junfu. Studies on simulation and performance of different gasification technologies for the IGCC system[J]. Electric Power, 2016, 49(10):49-54 [12] JOOS E, VITTU V. Analysis of IGCC acceptance test data:The puertollano case[C]//2001 Gasification Technologies Conference. 2001. [13] 许世森, 危师让. 国外4座大型IGCC电站的煤气化工艺[J]. 中国电力, 1999, 32(8):60-65 XU Shisen, WEI Shirang. Coal gasification technology in four large IGCC power plants abroad[J]. Electric Power, 1999, 32(8):60-65 [14] 冯展管, 吴成军. 燃气轮机联合循环机组参数优化及配置研究[J]. 内江科技, 2014, 35(10):63-64 FENG Zhanguan, WU Chengjun. Study on parameter optimization and configuration of gas turbine combined cycle unit[J]. Neijiang Technology, 2014, 35(10):63-64 [15] 李政, 梁心玉, 薛亚丽. 基于烟煤、褐煤的IGCC系统技术经济性对比[J]. 中国电机工程学报, 2012, 32(5):39-47 LI Zheng, LIANG Xinyu, XUE Yali. Techno-economic comparison of IGCC systems employing bituminous and lignite[J]. Proceedings of the CSEE, 2012, 32(5):39-47 [16] 乌若思. 未来的燃煤电厂-中国绿色煤电计划[J]. 中国电力, 2007, 40(3):6-8 WU Ruosi. Coal-fired power plant in the future-China's Green Project[J]. Electric Power, 2007, 40(3):6-8 [17] NAGAI T, KAJITANI S. Development of IGCC demonstration plant:from 200 t/d pilot plant to 250 MW demonstration plant(present status and future prospects of coal utilized power generation)[J]. Journal of the Japan Institute of Energy, 2007, 86(5):315-320. [18] 许世森, 程健. 煤气化制氢及氢能发电试验系统[J]. 中国电力, 2007, 40(3):9-13 XU Shisen, CHENG Jian. Hydrogen production based on gasification and hydrogen power test system[J]. Electric Power, 2007, 40(3):9-13 [19] 华欣. 华能:争做电力行业节能减排的领跑者[J]. 环境保护, 2013, 41(8):32-33 HUA Xin. Huaneng:Striving to become the leader in energy saving and emission reduction in the power industry[J]. Environmental Protection, 2013, 41(8):32-33 [20] 高远. 两段式干煤粉气化技术效力IGCC[J]. 化工装备技术, 2013(1):4 [21] 樊强, 许世森, 刘沅, 等. 基于IGCC的燃烧前CO2捕集技术应用与示范[J]. 中国电力, 2017, 50(5):163-167 FAN Qiang, XU Shisen, LIU Yuan, et al. Application and demonstration of IGCC-based pre-combustion CO2 capture technology[J]. Electric Power, 2017, 50(5):163-167 |