[1] 钱朝明, 王会, 吴永存, 等. 1000MW火电机组协调控制策略优化[J]. 中国电力, 2013, 46(3): 68-72. QIAN Chaoming, WANG Hui, WU Yongcun, et al. Optimization of coordinated control strategy for 1000-MW thermal power units [J]. Electric Power, 2013, 46(3): 68-72.
[2] 王俊俊, 张亮. 600MW机组电动给水泵并退过程中易出现的问题分析及解决方法[J]. 内蒙古石油化工, 2014, 40(19): 89-91. WANG Junjun, ZHANG Liang. The problem analysis and solution during the process of 600MW units electric feed pump combining and retreating [J]. Inner Mongolia Petrochemical Industry, 2014, 40(19): 89-91.
[3] 罗志浩, 王达峰, 姚文伟. 600MW机组RB功能试验及其分析[J]. 热力发电, 2007, 36(7): 62-65. LUO Zhihao, WANG Dafeng, YAO Wenwei. Test of runback function for 600MW unit and analysis thereof [J]. Thermal Power Generation, 2007, 36(7): 62-65.
[4] 邹永贵, 高伟. 300MW机组给水泵RB功能的探讨[J]. 电站系统工程, 2002, 18(5): 33-34. ZOU Yonggui, GAO Wei. Discussion on RB function of feedwater pump for 300MW unit[J]. Power System Engineering, 2002, 18(5): 33-34.
[5] 杨萍, 高龙军, 王晓刚, 等. 超临界600MW机组锅炉负荷控制策略优化[J]. 热力发电, 2015, 44(8): 113-115. YANG Ping, GAO Longjun, WANG Xiaogang, et al. Optimization of load control strategy for a supercritical 600MW unit boiler[J]. Thermal Power Generation, 2015, 44(8): 113-115.
[6] 赵志丹, 曹志刚, 刘斌, 等. 再热蒸汽供热机组的控制策略优化[J]. 热力发电, 2014, 43(11): 104-107. ZHAO Zhidan, CAO Zhigang, LIU Bin, et al. Control optimization strategy for units with reheat steam heating[J]. Thermal Power Generation. 2014, 43(11): 104-107.
[7] 韩忠旭, 潘钢, 邱忠昌, 等. 直流炉机组给水控制系统的设计与应用[J]. 中国电机工程学报, 2010, 30(2): 7-16. HAN Zhongxu, PAN Gang, QIU Zhongchang, et al. Design and application of feed water control system for once-through boiler power generation unit[J]. Proceedings of CSEE, 2010, 30(2): 7-16.
[8] 张秋生, 梁华, 胡花, 等. 超超临界机组的两种典型协调控制方案[J]. 中国电力, 2011, 44(10): 74-79. ZHANG Qiusheng, LIANG Hua, HU Xiaohua, et al. Two kinds of typical coordinated control systems in ultra-supercritical units[J]. Electric Power, 2011, 44(10): 74-79.
[9] 韩忠旭, 张智, 刘敏, 等. 北仑1和2号600MW单元机组协调控制系统的设计与应用[J]. 中国电机工程学报, 2006, 26(18): 126-132. HAN Zhongxu, ZHANG Zhi, LIU Min, et al. Application and design of coordinated control system for No. 1&2 600MW Unit of Beilun Power Plant[J]. Proceedings of CSEE, 2006, 26(18): 126-132.
[10] 郭瑞君, 秦成果, 张澎涛, 等. 基于热值校正的适应煤质变化协调控制系统研究[J]. 内蒙古电力技术, 2010, 28(4): 5-8. GUO Ruijun, QIN Chengguo, ZHANG Pengtao, et al. Research of coordinated control system adaptation to coal quality variation based on caloricity calibration[J]. Inner Mongolia Electric Power, 2010, 28(4): 5-8.
[11] 赵志丹, 顾涛, 陈志刚, 等. 超临界600MW机组协调控制的优化[J]. 热力发电, 2014, 43(2): 117-121. ZHAO Zhidan, GU Tao, CHEN Zhigang, et al. Optimization on coordinated control system of supercritical unit in Huaneng Shanghai Shidongkou Second Power Plant[J]. Thermal Power Generation, 2014, 43(2): 117-121.
[12] 杨婷婷, 曾德良, 王玮, 等. 大型燃煤发电机组煤质实时校正方法[J]. 电站系统工程, 2010, 26(5): 7-10. YANG Tingting, ZENG Deliang, WANG Wei, et al. Real-time coal quality correction method for large coal-fired power unit[J]. Power System Engineering, 2010, 26(5): 7-10.
[13] 赵志丹, 段元光, 梁朝, 等. 华电芜湖电厂超超临界660MW机组模拟量控制系统的优化[J]. 热力发电, 2011, 40(6): 61-64. ZHAO Zhidan, DUAN Yuanguang, LIANG Chao, et al. Optimization of analog control system for ultra supercritical 660 MW unit in Huadian Wuhu Power Plant[J]. Thermal Power Generation, 2011, 40(6): 61-64.
[14] 罗德海, 张长请, 蒋琳, 等. 锅炉蓄热补偿和煤质校正的研究与应用[J]. 热力发电, 2013, 42(1): 87-90. LUO Dehai, ZHANG Changqing, JIANG Lin, et al. Research and application of heat storage compensation and coal energy correct in fossil fuel power plants[J]. Thermal Power Generation, 2013, 42(1): 87-90.
[15] 刘磊, 高爱国, 骆意. 超超临界直流炉机组协调控制策略[J]. 中国电力, 2011, 44(10): 69-73. LIU Lei, GAO Aiguo, LUO Yi. Coordinated control strategy in unit with ultra-supercritical once-through boiler[J]. Electric Power, 2011, 44(10): 69-73.
[16] 王宏升, 吕春华. 1000MW超超临界直流锅炉的协调控制方法[J]. 电站系统工程, 2009, 25(4): 57-58. WANG Hongsheng, LV Chunhua. Coordinated control method of 1000MW ultra super-critical boiler[J]. Power System Engineering, 2009, 25(4): 57-58.
[17] 尹峰, 朱北恒, 李泉. 超(超)临界机组协调控制特性与控制策略[J]. 中国电力, 2008, 41(3): 66-69. YIN Feng, ZHU Beiheng, LI Quan. Characteristics and control strategies of coordinated control system (CCS) for supercritical and ultra supercritical power units[J]. Electric Power, 2008, 41(3): 66-69.
[18] 火力发电机组辅机故障减负荷技术规程: DL/T 1213—2013[S]. 北京: 中国电力出版社, 2013.
[19] 高春雨, 周倩, 杨尚. 亚临界300MW机组RB控制策略优化[J]. 热力发电, 2013, 42(9): 121-124. GAO Chunyu, ZHOU Qian, YANG Shang. Analysis and optimization of RB control strategy for a sub-critical 300MW unit[J]. Thermal Power Generation, 2013, 42(9): 121-124.
[20] 李锋, 黄卫剑. 一种给水泵RB工况失败的分析与总结[J]. 电站系统工程, 2010, 26(1): 35-38. LI Feng, HUANG Weijian. Analysis and summarization on the failure runback process of the feed water pump [J]. Power System Engineering, 2010, 26(1): 35-38.
[21] 赵军, 侯丽萍. 亚临界机组RB控制逻辑的优化[J]. 热力发电, 2010, 39(11): 69-72. ZHAO Jun, HOU Liping. Optimization of runback control logic for subcritical units [J]. Thermal Power Generation, 2010, 39(11): 69-72. |