中国电力 ›› 2017, Vol. 50 ›› Issue (6): 108-112.DOI: 10.11930/j.issn.1004-9649.2017.06.108.05

• 电网 • 上一篇    下一篇

特高压GIS现场安装用全封闭移动式厂房研制与应用

刘建楠1, 田文敏2, 张国强3, 阎国增1, 倪向萍1, 卞秀杰1   

  1. 1. 国家电网公司交流建设分公司,北京 100052;
    2. 北京送变电公司,北京 102401;
    3. 华东送变电工程公司,上海 201803
  • 收稿日期:2017-01-25 出版日期:2017-06-20 发布日期:2017-07-12
  • 作者简介:刘建楠(1986-),男,吉林长春人,高级工程师,从事输变电建设管理和施工技术工作。E-mail: 307700932@qq.com
  • 基金资助:
    国家电网公司科技项目(SGZJ0000JJJS1400634)

Manufacture and Application of the Fully-Enclosed Self-Assembly Building for UHV GIS Installation

LIU Jiannan1, TIAN Wenmin2, ZHANG Guoqiang3, YAN Guozeng1, NI Xiangping1, BIAN Xiujie1   

  1. 1. State Grid AC Engineering Construction Company, Beijing 100052, China;
    2. Beijing Electric Power Transmission and Transformation Company, Beijing 102401, China;
    3. East China Power Transmission and Transformation Engineering Company, Shanghai 201803, China
  • Received:2017-01-25 Online:2017-06-20 Published:2017-07-12
  • Supported by:
    ; This work is supported by the Science and Technology of SGCC Project (No. SGZJ0000JJJS1400634).

摘要: 特高压GIS现场安装用全封闭移动式厂房是一种用于户外GIS设备安装的新型工装,能够在工程现场营造一种全封闭的安装环境,克服外部环境对GIS安装的影响,保证GIS安装质量,提高安装效率,并为安装人员提供良好的工作环境。介绍了特高压GIS现场安装用全封闭移动式厂房的研制背景、基本结构形式与应用方式、工程应用情况及社会经济效益等内容。特高压GIS现场安装用全封闭移动式厂房在皖电东送工程、浙北—福州特高压交流输变电工程中进行了试用及全线推广应用,取得了非常好的效果,目前已确定在后续全部特高压交流工程中普遍应用。

关键词: 特高压GIS, 1 000 kV GIS安装, 全封闭厂房, 移动厂房, 室内化安装, 工厂化安装

Abstract: The fully-enclosed self-assembly building is a new sort of facility for outdoor UHV GIS installation, which creates a fully enclosed environment and overcomes the adverse influence of external environment. Hence it can ensure high quality of GIS installation, improve the installation efficiency, and provide good working environment. This paper mainly introduces the development background, basic structure, application mode, engineering application state and social economic benefits of the self-assembly building, which have been successfully used in Anhui-East project and Zhebei-Fuzhou project. Seeing its excellent application outcome, we have decided to popularize the installation of self-assembly building in all the subsequent UHV AC projects in China.

Key words: UHV GIS, 1 000 kV GIS installation, totally-enclosed building, self-assembly building, indoor installation, industrial installation

中图分类号: