[1] 中国南方电网公司. ±800 kV直流输电技术研究[M]. 北京:中国电力出版社,2006:2-60. [2] 石岩,韩伟,张民,等. 特高压直流输电工程控制保护系统的初步方案[J]. 电网技术,2007,31(2):11-15. SHI Yan, HAN Wei, ZHANG Min, et al. A preliminary scheme for control and protection system of UHVDC project[J]. Power System Technology, 2007, 31(2): 11-15. [3] 舒印彪,张文亮. 特高压输电若干关键技术研究[J]. 中国电机工程学报,2007,37(31):1-6. SHU Yinbiao, ZHANG Wenliang. Research of key technologies for UHV transmission [J]. Proceedings of the CSEE, 2007, 37(31): 1-6. [4] 李岩,黄立滨,洪潮,等. ± 800 kV 直流输电系统双12 脉动阀组投退策略分析[J]. 南方电网技术,2010,2(4):21-25. LI Yan, HUANG Libin, HONG Chao, et al. Analysis on the strategy of block/deblock dual 12-pulse valve groups in ±800 kV DC transmission system[J]. Southern Power System Technology, 2010, 2(4): 21-25. [5] 张志朝,王海军. 云广工程阀组旁路开关控制策略研究[J]. 电力系统保护与控制,2010,38(14):160-164. ZHANG Zhichao, WANG Haijun. Control strategy for valve group bypass switch in Yun-Guang project [J]. Power System Protection and Control, 2010, 38(14): 160-164. [6] 赵畹君. 高压直流输电工程技术[M]. 北京:中国电力出版社,2004. [7] 浙江大学发电教研组. 直流输电[M].北京:电力工业出版社,1982. [8] 张健毅,刘涛,郭果,等. 超(特)高压串联补偿控制保护系统与线路保护接口方案[J]. 中国电力,2013,46(7):77-81. ZHANG Jianyi, LIU Tao, GUO Guo, et al. Investigations on interface program of series capacitors’s control & protection system and line protection system in an EHV (UHV) transmission engineering [J]. Electric Power, 2013, 46(7): 77-81. [9] 朱韬析,王超. 天广直流输电系统的基本控制策略[J]. 电网技术,2007,31(21):22-25. ZHU Taoxi, WANG Chao. Basic control strategy for HVDC transmission system from Tianshengqiao to Guangzhou[J]. Power System Technology, 2007, 31(21): 22-25. [10] 刘洪涛,李建设,苏寅生,等. 云广±800 kV 直流输电工程控制系统的特点[J]. 南方电网技术,2010,4(2):35-38. LIU Hongtao, LI Jianshe, SU Yinsheng, et al. Characteristics of Yunnan-Guangdong ±800 kV DC transmission project control system [J]. Southern Power System Technology, 2010, 4(2): 35-38. [11] 徐攀腾,宋述波,张志朝. 特高压直流控制保护系统参数对零功率试验影响分析[J]. 中国电力,2013,46(6):34-37. XU Panteng, SONG Shubo, ZHANG Zhichao. Analysis of the effects of the control and protection system parameters on zero load test in Yunnan-Guangdong UHVDC transmission project [J]. Electric Power, 2013, 46(6): 34-37. |