[1] 李世伟,黄文彪.对实行工程量清单招标的几点思考[J].新疆有色金属,2007,30(34):56-57. LI Shi-wei,HUANG Wen-biao. Study on the bidding stage using the quantities bill management[J]. Xinjiang Nonferrous Metals,2007,30(34):56-57. [2] 杨国普.工程量清单计价模式下工程招标存在的风险分析及应对措施探讨[J]. 广东建材,2009,32(6):332-335. YANG Guo-pu.Risk and prevention during the bidding stage in the quantities bill management[J]. Guangdong Building Materials,2009, 32(6):332-335. [3] 宋志国,魏毅. 建设单位如何推进工程量清单计价管理[J].石油工程建设,2005,31(4):77-80. SONG Zhi-guo,WEI Yi. Study on implementing quantities bill management[J]. Petroleum Engineering Construction,2005,31(4):77-80. [4] 焦蒞昊,贾志超. 推行工程量清单计价模式的障碍因素及对策建议[J]. 价值工程,2010,29(27):51. JIAO Wei-hao, JIA Zhi-chao. Problem and strategies during implementing quantities bill management[J].Value Engineering,2010,29(27):51. [5] 朱宏羽.如何利用预算定额进行工程量清单报价[J]. 山西建筑,2003,19(6):237-238. ZHU Hong-yu. Discussion on the application of fixed budget to quantities bill management[J]. Shanxi Architecture,2003,19(6):237-238. [6] 莫谎. 业主对工程项目安全绩效影响的定量研究[J]. 土木工程学报,2006,39(3):127. MO Huang. Quantitative research on the affection of the owners on the safety performance of the project[J]. Civil Engineering Technology,2006,39(3):127. [7] 吴健梅, 陆明. 建设工程造价管理中的计算机技术[J]. 哈尔滨工业大学学报,2004,36(3):395-397. WU Jian-mei,LU Ming. The computer technology in the price management of construction project[J]. Journal of Harbin Institute of Technology,2004,36(3):395-397. [8] 董河毅.浅谈推行工程量清单计价模式的环境要求[J]. 山西建筑,2010,36(34):253-254. DONG He-yi. The study on the environment in the quantities bill price management[J]. Shanxi Architecture,2010,36(34):253-254. |