[1] 刘鑫屏,田亮,赵征,等. 汽包锅炉蓄热系数的定量分析[J]. 动力工程,2008,28(2):216-220. LIU Xinping, TIAN Liang, ZHAO Zheng, et al. The quantitative analysis of the drum boiler heat storage coefficient[J]. Power Engineering, 2008, 28(2): 216-220. [2] 邓拓宇,田亮,刘吉臻. 超超临界直流锅炉蓄热能力的定量分析[J]. 动力工程学报,2012,32(1):10-14,20. DENG Tuoyu, TIAN Liang, LIU Jizhen. Quantitative analysis on heat storage capacity of ultra-supercritical once-through boilers [J]. Journal of Chinese Society of Power Engineering, 2012, 32(1): 10-14, 20. [3] 秦志明,刘吉臻,张栾英,等. 超临界直流锅炉蓄热的分析与计算[J]. 动力工程学报,2013,33(4):250-255. QIN Zhiming, LIU Jizhen, ZHANG Luanying, et al. Analysis and calculation of heat storage supercritical once-through boilers [J]. Journal of Chinese Society of Power Engineering, 2013, 33(4): 250-255. [4] 刘吉臻,秦志明,张栾英,等. 汽包锅炉蓄热分析与计算[J]. 动力工程学报,2012,32(2):96-100. LIU Jizhen, QIN Zhiming, ZHANG Luanying, et al. Analysis and calculation of heat storage capacity in drum boilers [J]. Journal of Chinese Society of Power Engineering, 2012, 32(2): 96-100. [5] 张小辉,贾焕忠,郭敏,等. 循环流化床锅炉机组协调控制系统的研究[J]. 热力发电,2012,41(5):87-91. ZHANG Xiaohui, JIA Huanzhong, GUO Min, et al. Study on coordinated control system of units equipped with CFB boiler [J]. Thermal Power Generation, 2012, 41(5): 87-91. [6] 王立. 间接能量平衡协调控制系统前馈控制策略的优化[J]. 热力发电,2013,42(4):53-56. WANG Li. Optimization of feedforward control strategy for coordinated control system with indirect energy balance [J]. Thermal Power Generation, 2013, 42(4): 53-56. [7] 刘吉臻,田亮,曾德良,等. 660 MW机组负荷-压力非线性特性的分析[J]. 动力工程,2005,25(4):533-536,540. LIU Jizhen, TIAN Liang, ZENG Deliang, et al. Analysis on the nonlinearity of load-pressure characteristics of a 660 MW unit [J]. Power Engineering, 2005, 25(4): 533-536, 540. [8] 田亮,曾德良,刘吉臻,等. 简化的330 MW机组非线性动态模型[J]. 中国电机工程学报,2004,24(8):180-184. TIAN Liang, ZENG Deliang, LIU Jizhen, et al. A simplified non- linear dynamic model of 330 MW unit[J]. Proceedings of the CSEE, 2004, 24(8): 180-184. [9] 张锐锋,李小军,潘华,等. 两种亚临界机组负荷-压力简化模型对比及实验分析[J]. 中国电力,2015,48(10):23-27. ZHANG Ruifeng, LI Xiaojun, PAN Hua, et al. Comparison and experiment analysis of two simplified load-pressure model of subcritical units [J]. Electric Power, 2015, 48(10): 23-27. [10] 石辉. 基于在线分布负荷预测的智能AGC主动协调控制系统[J]. 中国电力,2015,48(12):122-128. SHI Hui. Study on the intelligent AGC initiative coordinated control system based on the online prediction of distributed power load [J]. Electric Power, 2015, 48(12): 122-128. [11] 韩忠旭,齐小红,黄焕袍,等. 预给煤控制逻辑在单元机组协调控制系统中的应用[J]. 中国电力,2007,40(3):61-65. HAN Zhongxu, QI Xiaohong, HUANG Huanpao, et al. Application of the pre-feed coal control logic in CCS of power generation unit [J]. Electric Power, 2007, 40(3): 61-65. [12] 尹峰,朱北恒,罗志浩,等. 基于预给煤动态模型的直接指令平衡系统在火电厂协调控制中的应用[J]. 中国电力,2007,40(11): 89-92. YIN Feng, ZHU Beiheng, LUO Zhihao, et al. Application of direct instruction balance (DIB) system based on the pre-feed coal dynamic model in CCS of thermal power plants[J]. Electric Power, 2007, 40(11): 89-92. [13] 王漪,薛永锋,张敏,等. 基于能量平衡法的供热机组电量分析数学模型[J]. 电力系统自动化,2014,38(8):108-112. WANG Yi, XUE Yongfeng, ZHANG Min, et al. Mathematical model for power quantity analysis of heating unit based on energy balance method[J]. Automation of Electric Power Systems, 2014, 38(8): 108-112. [14] 陈彦桥,薛翔宇,刘立衡,等. 大同二电厂7号机组协调控制系统优化[J]. 中国电力,2011,44(3):69-72. CHEN Yanqiao, XUE Xiangyu, LIU Liheng, et al. Coordinated control system optimization of No.7 unit in Datong 2nd Power plant [J]. Electric Power, 2011, 44(3): 69-72. |