[1] NILSSON J. On maintenance management of wind and nuclear power plants[D]. Stockholm, Sweden: KTH-Royal Institute of Technology Stockholm, 2009: 8-12 [2] 杭俊,张建忠,程明,等. 风力发电系统状态监测和故障诊断技术综述[J]. 电工技术学报,2013,28(4):261-271. HANG Jun, ZHANG Jian-zhong, CHENG Ming, et al . An overview of condition monitoring and fault diagnostic for wind energy conversion system[J]. Transactions of China Electro- technical Society, 2013, 28(4): 261-271. [3] 王佳明,刘文颖,魏帆,等. 基于寿命周期成本管理的输变电设备状态检修策略研究[J]. 电力系统保护与控制,2011,39(5): 77-80. WANG Jia-ming, LIU Wen-ying, WEI Fan, et al . Study on policies of condition based maintenance of transmission and distribution equipments combined with life cycle cost management[J]. Power System Protection and Control, 2011, 39(5): 77-80. [4] MÁRQUEZ F, TOBIAS A, PÉREZ J, et al . Condition monitoring of wind turbines: techniques and methods[J]. Renewable Energy, 2012, 46: 169-178 [5] 吕文元. 延迟时间维修理论在制定设备维修计划中的应用[J]. 中国设备工程,2006(9):13-14. LU Wen-yuan. Application of time-delay maintenance theory in making maintenance schedule for equipment[J]. China Plant Engineering, 2006(9): 13-14. [6] 郑睿,吕文元. 基于时间延迟理论的预防维修模型及案例研究[J]. 中国管理科学,2010,18(2):48-54. ZHENG Rui, LU Wen-yuan. Modeling of preventive maintenance based on the delay time theory and case study[J]. Chinese Journal of Management Science, 2010, 18(2): 48-54. [7] 严骏,李永贵,凌海风,等. 基于延迟时间理论的设备点检周期模型[J]. 解放军理工大学学报:自然科学版,2010,11(5):557-560. YAN Jun, LI Yong-gui, LING Hai-feng, et al . Interval model of spot checking for equipment based on principle of delay time model[J]. Journal of PLA University of Science and Technology:Natural Science Edition, 2010, 11(5): 557-560. [8] 马晓芳,高学东,贾希胜,等. 发电设备点检周期模型[J]. 中国电力,2007,40(11):67-71. MA Xiao-fang, GAO Xue-dong, JIA Xi-sheng, et al . Research on interval model of spot checking for power equipment[J]. Electric Power, 2007, 40(11): 67-71. [9] 孙才新. 输变电设备状态在线监测与诊断技术现状和前景[J]. 中国电力,2005,38(2):1-7. SUN Cai-xin. Present situation and development of condition on- line monitoring and diagnosis technology for power transmission and transformation equipment [J]. Electric Power, 2005, 38(2): 1-7. [10] KUMAR D, WESTBERG U. Proportional hazards modeling of time-dependent covariates using linear regression :a case study[mine power cable reliability][J]. IEEE Transactions on Reliability, 1996, 45(3): 386-392. [11] 左洪福,张海军,戎翔. 基于比例风险模型的航空发动机视情维修决策[J]. 航空动力学报,2006,21(4):716-721. ZUO Hong-fu, ZHANG Hai-jun, RONG Xiang. Condition based aero-engine maintenance decision method using proportional hazards model [J]. Journal of Aerospace Power, 2006, 21(4): 716-721. [12] MAKIS V, JARDINE A K S. Optimal replacement in the proportional hazards model [J]. INFOR, 1991, 30(3): 172-183 [13] 张海军. 民航发动机性能评估方法与视情维修决策模型研究[D]. 南京:南京航空航天大学,2007,33-76. [14] 张继权,赵洪山. 基于比例失效模型的风机齿轮箱轴承检修[J]. 电源技术,2011,35(5):570-573. ZHANG Ji-quan, ZHAO Hong-shan. Wind turbine gearbox bearings maintenance based on proportional hazards model[J].Chinese Journal of Power Source, 2011, 35(5): 570-573. [15] 赵洪山,鄢盛腾,刘景青. 基于机会维修模型的风电机组优化检修[J]. 电网与清洁能源,2012,28(7):1-5. ZHAO Hong-shan, YAN Sheng-teng, LIU Jing-qing. Optimization maintenance of wind turbine based on opportunistic maintenance model [J]. Power System and Clean Energy, 2012, 28(7): 1-5. |