中国电力 ›› 2013, Vol. 46 ›› Issue (2): 60-64.DOI: 10.11930/j.issn.1004-9649.2013.2.60.4

• 电网 • 上一篇    下一篇

基于集合覆盖模型的电费缴纳点选址研究

江元1, 王冰2, 张婷2, 熊威2, 何永秀2   

  1. 1. 甘肃省电力公司,甘肃 兰州 730050;
    2. 华北电力大学 经济与管理学院,北京 102206
  • 收稿日期:2012-08-23 出版日期:2013-02-05 发布日期:2015-12-10
  • 作者简介:江元(1977—),男,甘肃兰州人,高级工程师,从事电力营销管理方面的研究。E-mail: 13893651376@163.com
  • 基金资助:
    国家电网公司管理咨询项目:基于新型营销组织模式的智能用电客户电费缴纳体系建设研究

Site Selection of Electricity Office Based on Set Covering Model

JIANG Yuan1, WANG Bing2, ZHANG Ting2, XIONG Wei2, HE Yong-xiu2   

  1. 1. Ganshu Electric Power Corporation, Lanzhou 730050, China;
    2. School of Economics and Management, North China Electric Power University, Beijing 102206, China
  • Received:2012-08-23 Online:2013-02-05 Published:2015-12-10

摘要: 在大营销体系下,各省市电力公司都在倾力打造“10分钟缴费圈”,为电力用户提供方便、快捷、多样化的电费缴纳方式。在分析国内现有电费缴纳方式的基础上,构建了基于“10分钟缴费圈”的电费缴纳点选址集合覆盖模型,同时以各种电费缴纳方式的费率为权重,提出了带权的集合覆盖模型。通过对甘肃省兰州市安宁区电费缴纳点和现有的居民小区的地理位置进行分析,运用LINDO软件对建立的集合覆盖模型进行优化求解,证明了该模型的可行性。该模型可以帮助各地区选择合适的电费缴纳合作伙伴,以最小的投资成本获得最大的用户满意度。

关键词: 集合覆盖, 电费缴纳方式, 10分钟缴费圈

Abstract: In the context of extensive marketing system, the provincial and municipal power companies are making efforts to implement the idea of“Electricity payment within ten-minute walk” in order to provide fast, convenient, and diversified bill payment methods. Based on the analysis of the existing domestic and foreign electricity payment methods, a set covering model of site selection for electricity payment office based on the idea is established. In addition, a weighted set covering model that takes the electricity payment rates as weight is built at the same time. By analyzing the locations of electricity payment offices and the neighbourhoods in Anning District of Lanzhou, Gansu Province, the optimization and solution of the set covering model is carried out with the LINDO software, which proves the feasibility of the model. The result indicates that the model can help all regions to select the appropriate electricity payment partners to maximize the user satisfaction with minimal investment cost.

Key words: set covering, electricity payment method, electricity payment within ten-minute distance

中图分类号: