[1] BALLA A. The resistance to breaking out of mushroom foundations for pylons[C]//Proceedings of the Fifth International Conference on Soil Mechanics and Foundation Engineering, Paris, France, 569-576. [2] MORS H. Methods of dimensioning for uplift foundations of transmission line towers[C]// Conference Internationale des Grands Reseaux Electriqure a Haute Tension, Session 1964, 210:1-14. [3] MEYERHOF G G, ADAMS J I. The ultimate uplift capacity of foundations [J]. Canadian Geotechnical Journal, 1968, 5(4): 225-244. [4] MATSUO M. Study on the uplift resistance of footing (Ⅰ)[J]. Soils and Foundations, 1967, 7(4): 1-37. [5] MATSUO M. Study on the uplift resistance of footing(Ⅱ) [J]. Soils and Foundations, 1968, 8(1): 18-48. [6] 李正民. 土体抗拔性能的试验研究及其理论分析[C]//高压输电线路学术讨论会论文集. 郑州,1981. [7] 鲁先龙,程永锋,张宇. 输电线路原状土基础抗拔极限承载力计算[J]. 电力建设,2006,27(10):28-32. LU Xian-long, CHENG Yong-feng, ZHANG Yu. Calculation on ultimate uplift bearing capacity of undisturbed soil foundation [J]. Electric Power Construction, 2006, 27(10): 28-32. [8] 王学明,王虎长,胡建民. 送电线路掏挖基础抗拔力理论计算公式修正[J]. 电网与清洁能源,2007,23(8):39-46. WANG Xue-ming, WANG Hu-chang, HU Jian-min, et al . Modification of theoretical calculation formulas on withdrawal resistance of undercut foundation for transmission line[J].Power System and Clean Energy,2007,23(8):39-46. [9] DL/T 5219—2005 架空送电线路基础设计技术规定[S]. [10] 鲁先龙,程永锋,崔强,等. 原状土杆塔基础剪切法抗拔稳定计算参数A1和A2的研究(ZGC2010-022)[R]. 北京:中国电力科学研究院,2010. [11] 鲁先龙,杨文智,童瑞铭,等. 输电线路掏挖基础抗拔极限承载力的可靠度分析[J]. 电网与清洁能源,2012,28(1):9-15,44. LU Xian-long, YANG Wen-zhi, TONG Rui-ming, et al . Reliability analysis on ultimate uplift bearing capacity of belled pier foundation in transmission line engineering [J]. Power System and Clean Energy, 2012, 28(1): 9-15, 44. [12] 鲁先龙,乾增珍,童瑞铭,等. 戈壁碎石土地基原状土掏挖基础抗拔试验研究[J]. 土木建筑与环境工程,2012,34(4):24-30, 58. LU Xian-long, QIAN Zeng-zhen, TONG Rui-ming, et al . Field tests analysis on belled pier foundations under tensile load in gravel Gobi[J]. Journal of Civil Architectural & Environmental Engineering, 2012, 34(4): 24-30, 58. [13] HIRANY A, KULHAWY F H. Conduct and interpretation of load tests on drilled shaft foundations: detailed guidelines (Rep. No. EL-5915) [R]. Palo Alto, Calif, USA: Electric Power Research Institute, 1988. [14] HOUSEL W S. Pile load capacity: estimates and test results[J]. Journal of Soil Mechanics and Foundation Division, 1966, 92(SM4): 1-30. [15] TOMLINSON M J. Pile design and construction practice: a viewpoint publication [M]. London: Cement & Concrete Association of Great Britain, 1977. [16] PHOON K K. Reliability-based design in geotechnical engineering: computations and applications [M]. London: Taylor & Francis, 2008. [17] DITHINDE M, PHOON K K, WET M D, et al . Characterization of model uncertainty in the static pile design formula[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2011, 137(1): 70-85. [18] PACHECO M P, DANZIGER F A B, PINTO C P. Design of shallow foundations under tensile loading for transmission line towers: an overview [J]. Engineering Geology, 2008, 101(3-4): 226-235. [19] 中华人民共和国电力行业标准 架空输电线路基础设计技术规定(报批稿)[S]. 武汉:中南电力设计院,2012. [20] Q/GDW 1841—2012 架空输电线路杆塔基础设计规范[S]. [21] 陈海波,廖宗高,肖洪伟. 受风荷载控制的杆塔结构体系可靠度分析[J]. 电力建设,2007,28(7):40-42,45. CHEN Hai-bo, LIAO Zong-gao, XIAO Hong-wei. Reliability analysis of tower structure under wind load[J]. Electric Power Construction, 2007, 28(7): 40-42, 45. |