[1] 于幼文,金永纯,高毅.我国500 kV紧凑型输电线路的研究与应用[J].电力设备,2004,5(6):9-12. YU You-wen, JIN Yong-chun, GAO Yi. Research and application on 500 kV compact transmission line in China[J]. Electrical Equipment, 2004,5(6):9-12. [2] 张勇平,刘鸿斌,邓春,等.沽太500 kV双回线路覆冰舞动故障分析[J].中国电力,2010,43(3):27-30. ZHANG Yong-ping, LIU Hong-bin, DENG Chun, et al . Analysis of 500 kV Gu-Tai transmission line ice-coating galloping[J].Electric Power, 2010,43(3):27-30. [3] 华北电网有限公司.华北电网调度管理规程[M].北京:中国电力出版社,2011:26. [4] 陈海波.国内外城市大面积停电分析及启示[J].广东电力,2008, 21(2):34-39. CHEN Hai-bo. Analysis and inspiration of large-scale blackout in cities at home and abroad[J]. Guangdong Electric Power, 2008,21(2): 34-39. [5] 陆佳政,蒋正龙,雷红才.湖南电网2008 年冰灾事故分析[J].电力系统自动化,2008,32(11):17-19. LU Jia-zheng, JIANG Zheng-long, LEI Hong-cai. Analysis of Hunan power grid ice disaster accident in 2008[J]. Automation of Electric Power Systems, 2008,32(11):17-19. [6] 汪若品,孙国彬.电网应对冰雪灾害防范措施的探讨[J].供用电,2008,25(3):32-34. WANG Ruo-pin, SUN Guo-bin. Discussion on the prevention measures of power network against snow and ice disaster[J].Distribution & Utilization, 2008,25(3):32-34. [7] 张锋.预防和应对电网大停电事故的研究[J].华东电力,2007, 35(4):37-40. ZHANG Feng. Prevention and handling measures for blackouts[J].East China Electric Power, 2007,35(4):37-40. [8] 陈敏智.“8·22”电网事故教训[J].电力安全技术,2007,9(6):26-28. CHEN Min-zhi. Lessons for the“8·22” power grid accident[J].Electric Safety Technology, 2007,9(6):26-28. [9] 唐斯庆,张弥,李建设.海南电网“9·26”大面积停电事故的分析与总结[J].电力系统自动化,2006,30(1):1-7. TANG Si-qing, ZHANG Mi, LI Jian-she. Review of blackout in Hainan on Spetember 26th cause and recommendations[J].Automation of Electric Power Systems,2006,30(1):1-7. [10] 侯慧,尹项根,游大海,等.国外经验对我国应急减灾机制的启示[J].电力系统自动化,2008,32(12):89-93. HOU Hui, YIN Xiang-gen, YOU Da-hai, et al . Apocalypse of overseas experience on China power system emergency disaster prevention mechanism[J].Automation of Electric Power Systems, 2008,32(12):89-93. [11] 贾长朱.从美、加停电事故看我国电力系统安全[J].现代电力,2004,21(3):70-73. JIA Chang-zhu. Analysing our electric networks safety from the US/Canada power down event[J].Modern Electric Power,2004,21(3):70-73. [12] 周勇,陈震海,华中(河南)电网“7·1”事故分析与思考[J].湖南电力,2008,28(3):28-30,47. ZHOU Yong, CHEN Zhen-hai. Analysis of the“7·1” network incident of central China(Henan)[J]. Hunan Electric Power, 2008, 28(3):28-30,47. [13] 邹江峰,章显亮.巴西“2009·11·10”和“2011·2·4”大停电事故及启示[J].中国电力,2011,44(11):19-22. ZOU Jiang-feng, ZHANG Xian-liang. Summary and revelation of“2009·11·10” and “2011·2·4” blackouts in Brazil power system[J]. Electric Power, 2011,44(11):19-22. [14] 李国柱.华中电网“5·29”事故处理及分析[J].华中电力,2007,20(6):36-39. LI Guo-zhu. The treatment and analysis for“5·29” accident of Central China Power Grid[J]. Central China Electric Power, 2007, 20(6):36-39. [15] 蒋利发,蒋春芳.地方电网大面积停电事故应急预案的制订[J].供用电,2007,24(3):27-28,34. JIANG Li-fa, JIANG Chun-fang. Contingency plan formulation for large area power outage of regional power grid[J]. Distribution & Utilization, 2007,24(3):27-28,34. [16] 张颖,熊德智,梁运华,等. 500 kV电网运行集控中心设计与实现[J].中国电力,2010,43(7):81-85. ZHANG Ying, XIONG De-zhi, LIANG Yun-hua, et al . Design and implementation of 500 kV power grid operating centralized control center[J]. Electric Power, 2010,43(7):81-85. |