[1] GB 50545—2010 110 kV~750 kV架空输电线路设计规范[S]. 北京:中国计划出版社,2010. [2] 张殿生. 电力工程高压送电线路设计手册[M]. 北京:中国电力出版社,2002:52-56,151. [3] EPRI. EPRI AC transmission line reference book—200 kV and Above[M]. Third Edition, 2005. [4] 王晓彤,林集明,班连庚,等. 广东500 kV同塔四回线路相序排列的选择[J]. 电网技术,2009,33(19):88-91. WANG Xiaotong, LIN Jiming, BAN Liangeng, et al. Selection of phase sequence arrangement for guangdong 500 kV power transmission line adopting structure of four circuits on the same tower [J]. Power System Technology, 2009, 33(19): 88-91. [5] 张晓,周浩,赵斌财,等. 500 kV同塔四回输电线路最优相序布置[J]. 中国电力,2010,43(2):43-47. ZHANG Xiao, ZHOU Hao, ZHAO Bincai, et al. Research on optimized phase sequence arrangements for 500 kV quadruple- circuit transmission line on the same tower[J]. Electric Power, 2010, 43(2): 43-47. [6] 班连庚,王晓刚,白宏坤,等. 同塔架设的220 kV/500 kV输电线路感应电流和感应电压的仿真分析[J]. 电网技术,2009,33(6):45-49. BAN Liangeng, WANG Xiaogang, BAI Hongkun, et al. Simulative analysis of induced voltages and currents among multi circuit 220 kV and 500 kV transmission lines on same tower[J]. Power System Technology, 2009, 33(6): 45-49. [7] 姜彤,郭志忠,陈学允. 多态相分量法及其在电力系统三相不对称分析中的应用[J]. 中国电机工程学报,2002,22(5):70-74. JIANG Tong, GUO Zhizhong, CHEN Xueyun, et al. Polymorphic phase components method and its application in three-phase unbalance calculation of power system[J]. Proceedings of the CSEE, 2002, 22(5): 70-74. [8] 周冠波,李晓华,蔡泽祥,等. 同杆多回线路不平衡问题分析与对策[J]. 电力系统自动化,2010,34(16):58-63. ZHOU Guanbo, LI Xiaohua, CAI Zexiang, et al. Analysis and countermeasures for the unbalance problem of multi-parallel line on the same tower[J]. Automation of Electric Power Systems, 2010, 34(16): 58-63. [9] 韦刚,张子阳,房正良,等. 多回输电线路并架的不平衡性分析[J]. 高电压技术,2005,31(4):9-11,41. WEI Gang, ZHANG Ziyang, FANG Zhenglian, et al. Analysis of imbalance of the parallel multi-circuit transmission line[J]. High Voltage Engineering, 2005, 31(4): 9-11, 41. [10] 汪晶毅,李志泰,潘春平,等. 500 kV狮洋至五邑线路电气不平衡度的研究[J]. 南方电网技术,2009,3(S1):145-149. WANG Jingyi, LI Zhitai, PAN Chunping, et al. Research on electric unbalance degree of 500kV Shiyang to Wuyi line[J]. Sounthern Power System Technology, 2009, 3(S1): 145-149. [11] 汪晶毅,李志泰,曹祥麟,等. 1 000 kV交流同塔双回线路电气不平衡度的研究[J]. 南方电网技术,2010,4(S1):108-112. WANG Jingyi, LI Zhitai, CAO Xianglin, et al. Research on electric unbalance degree of 1 000 kV AC double-circuit on the same tower[J]. Sounthern Power System Technology, 2010, 4(S1):108-112. [12] GB/T 15543—2008 电能质量三相电压不平衡[S]. 北京:中国标准出版社,2008. [13] GB 755—2008 旋转电机 定额和性能[S]. 北京:中国标准出版社,2008. [14] PILLAY P, MANYAGE M. Definitions of voltage unbalance [J]. IEEE Power Eng. Rev, 2001, 21(11): 50-51. [15] Q/CSG 110011—2012 南方电网220 kV线路保护技术规范[S]. 广州:中国南方电网有限责任公司. [16] 吴文辉,曹祥麟. 电力系统电磁暂态计算与EMTP应用[M]. 北京:中国水利电力出版社,2012:40-42,72-75. [17] BPA. Electromagnetic transients program rule book[M]. Oregon: BPA, 1982: 51-57. [18] DOMMEL H W. 电力系统电磁暂态计算[M]. 李永庄,林集明,译. 北京:水利电力出版社, 1991:41-52. [19] MART J R. Accurate modeling of frequency-dependent transmission lines in electromagnetic transient simulations [J]. IEEE Transaction on Power Apparatus and System, 1982, PAS-101(1): 147-157. [20] 汪晶毅,李志泰,潘春平. 同塔多回输电线路感应电压和感应电流的研究[J]. 电力建设,2011,32(3):56-60. WANG Jingyi, LI Zhitai, PAN Chunping, et al. Research on induced voltage and current of multi-circuit on the same tower[J]. Electric Power Construction, 2011, 32(3): 56-60. |