300 MW CFB锅炉下二次风口磨损分析及解决对策
薛文祥
Analysis and Measures of Secondary Air Gate Wearing in 300-MW CFB Boilers
XUE Wen-xiang
中国电力 . 2013, (9): 21 -23 .  DOI: 10.11930/j.issn.1004-9649.2013.9.21.2